preload

Reliability – Operation

Posted by Albert Gareev on Aug 01, 2014 | Categories: DocumentsRequirements

Automated tests must be delivered as a software product which can be used (operated) by testers and other team members without special technical skills in programming or automation tools.

Operation requirements for all setup and preparation procedures:

  • Must require only general computer skills;
  • Must follow a single standard;
  • Must use centralized and unified configuration file(s).

Failure criteria:

  • Test Suite could not be used for the purpose it has been created (smoke test, sanity test, etc.).
  • Test Suite does not provide required level of coverage.
  • Cumulative manual operation time (setup, launch, review of results) is equal or exceeds plain manual testing time for the same coverage level.

Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported
This work by Albert Gareev is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported.